50 metre tower (INGAL),
• Civils of tower foundation and ODU foundation
• Assembly and Erection of tower
• Installation of 6 antennas for VHA / Optus– includ-ing RRUs, combiners, hy-brids
• Earthing of site
• Supply and install cable tray and posts
• Landing ODU, terminating hybrids and internal works including Elteks, batteries
• Level 1 and AC power works
• Weedmat + Gravel
• Link TX site via 1200mm dishes