New steel work platform with Brick template shrouds to be assembled and installed on rooftop of Bowral Hospital.
• Installation and assembly of platform and supply and install shroud.
• ODU up on rooftop in new platform.
• Antennas and Hybrids and RRUs.
• Earthing of site.
• Supply and install cable tray and posts.
• terminating hybrids and internal works including Elteks, batteries.
• AC power works.
• Integrate site.