VHA – Silverwater Posted on July 23, 2019 by ozsyng Involved foundation de-sign change.• Bored pier with pile cap/pad type footing.• Foundation was bituem, concrete, fill ( bricks), then until hitting 3m deep soil was derived.• New VHA greenfield, steel pole type structure.