VHA – LOWESDALE

50 metre tower (INGAL),

• Civils of tower foundation and ODU foundation

• Assembly and Erection of tower

• Installation of 6 antennas for VHA / Optus– includ-ing RRUs, combiners, hy-brids

• Earthing of site

• Supply and install cable tray and posts

• Landing ODU, terminating hybrids and internal works including Elteks, batteries

• Level 1 and AC power works

• Weedmat + Gravel

• Link TX site via 1200mm dishes