VHA – Silverwater
Involved foundation de-sign change. • Bored pier with pile cap/pad type footing. • Foundation was bituem, concrete, fill ( bricks), then until hitting 3m deep soil was derived. • New …
Involved foundation de-sign change. • Bored pier with pile cap/pad type footing. • Foundation was bituem, concrete, fill ( bricks), then until hitting 3m deep soil was derived. • New …
Optus greenfield. • ODU concrete slab. • Installation and assembly of platform and supply and install shroud. • Antennas and Hybrids and RRUs. • Earthing of site. • Supply and …
Optus greenfield • Retaining wall. • ODU concrete platform. • Installation and assembly of platform and supply and install shroud. • Fencing. • Antennas and Hybrids and RRUs. • Earthing …
50 metre tower (INGAL), • Civils of tower foundation and ODU foundation • Assembly and Erection of tower • Installation of 6 antennas for VHA / Optus– includ-ing RRUs, combiners, …